HomeAboutWind & HybridConcrete & BuildingReferencesKnowledgeSoftwareContactCookies
19 June 2013
Design of wind turbine foundation
TEROC has received an assignment to design the foundation for a 10 kW wind turbine, which will be built on Glava Energy Center. The project includes load calculation according to IEC 61400-2.

Since before, TEROC also participates in wind measurements done in Glava. We took part from the beginning of the project, including specification and erection of the mast. The measurements are logged via a web-based solution from TEROC, which makes data stored safely and easy to access and analyze. Data availability has so far been 100 % since the start.

For more information about Glava Energy Center, see www.glavaenergycenter.se
News
3 September 2019
3D model of small wind turbine blades
28 June 2019
Assignment for CECEP Wind-power Corporation
24 April 2019
"Stora Elbilsdagen" the 5 May 2019
31 December 2017
Mälardalen University
2 December 2017
New type of foundation for wind turbines
10 August 2017
Interaction with Ferroamp equipment
15 March 2017
ÅF acquires TEROC Engineering AB
11 January 2017
Lighting on DC
31 December 2016
Wind measurements in Indonesia
21 September 2016
TEROC focuses on FOSS
[1]​[2]​[3]​[4]​[5]​
TEROC AB • Köping • Tel +46 70 22 98 678
Provided by Webforum